
I inserted acrylic pieces of different sizes by wedging them between the formwork.

When I poured the concrete, it flowed under and over the pieces to fill the 2x4x4 box.


Final was a bit crumbly. I may have left it in the mold for too long. The mixture may have also been too watery,